The modular HoldFast Rubber Highway is exceptionally fast to install and can sit on random sleeper centres. For example, it took approximately one week to fully install the three hundred metre test track at Corby.
TRACK PREPARATION

This is the quickest stage of the project.

Prior to installation, our favoured conractor will come onto the site with a track crew and tamper. The tamper then levells and adjusts the sleepers / rail to make them uniform throughout the three hundred metre site.

It should be noted that it is not necessary to move the sleepers to specific centres. This is one of the considerable time and cost saving benefits of the rubber highway.

THE PANELS

The HoldFast panels are 1.8metres to 5 metres in length when positioned laterally along the track. They consist of a cess panel (outisde of the rail edge) and one full guage panel (these sit in between the two rails), joined via a unique connecting system.

The panels have been thoroughly tested and proven in some of the most critical level crossing locations on the UK rail network.

The HoldFast Rubber Highway system also includes side kerbs (not installed on the Corby trial).
INSTALLATION PROCESS

The panels arrive on site by articulated lorry and will continue to arrive periodically throughout the installation works period.

They can be delivered in manageable numbers to suit the installation crews, keeping local disruption to a minimum and leaving the site relatively free of materials during the day.

The installation itself only requires limited plant equipment on site. Typically Bobcats, JCB’s, tele-handlers or a road/rail lifting machine are used, in this case it was a JCB.


The HoldFast panels have been thoroughly tested and found to comply to Network Rail's specifications for a road surface.